Spinzilla 2017

hooray!  spinzilla has officially concluded and at midnight my time zone all the yardage should have been submitted and the finally team tallies will begin.

I really pushed myself this year and placed my goal well outside of my reach.  at times I wasn't sure if I'd even make it.  even my hubby had to cheer me on and give a pep talk about keep working to meet my goal.  it was was close there for a few  hours (a day).  my goal this year to spin 5 km.  That is 5468 yards (5000 meters).

at the end of it all, I did make my goal and passed it by just over 100 meters (technically 168 meters).

here is my schedule for the week and what actually was  spun.  I was bummed I didn't get to the Sweet Georgia fiber I wanted to spin for this year, but I was unsure of with kind of prep that was needed, I decided to pass in order to make my mileage. of course I plied everything into a 2 ply yarn, so the mileage includes plying credit.

three days I spun until late, around 10:30 pm - 11:00 pm which is pretty late for us.  we go to bed early (7:30 pm) 

DAY 1 10-02-2017
===================================
Begin Spinning at 7:10 am PST
Merino & 64's_colorway blur/green and white
70/30 merino and silk_colorway jamaica




Merino rolags
70/30 fiber

DAY 2 10-03-2017
===================================
Finish Jamaica
ROTO Black welsh_colorway black
*ROTO Icelandic lamb_colorway black* Did not spin
Sore back between shoulders
More stretching needed

merino spun into singles

70/30 singles on the wheel

finished merino on the bobbin
completed merino and 70/30

 DAY 3 10-04-2017
===================================
Finish ROTO
Corriedale_colorway white
Begin bag 1

ROTO black welsh fiber

ROTO spun into singles

DAY 4 10-05-2017
===================================
Catch up on plying
Corriedale bag 2
*Sweet Georgia_colorway firestarter (2017 Spinzilla color)* Did not spin


corriedale crimp

corriedale singles on the bobbin
DAY 5 10-06-2017
===================================
Corriedale bag 3
Begin Karakul_colorway grey tomorrow (10/07)
*Coopworth_colorway white* Did not spin

completed corriedale 2 ply yarn waiting to be measured
DAY 6 10-07-2017
===================================
Begin Karakul



karakul fiber

finished karakul and corriedale waiting to be measured
DAY 7 10-08-2017
===================================
Ply any Corriedale and Karakul singles
Measure
End Spinning with final count at 4:00 pm PST

completed 5168 meters of fiber spun


64's (left) 357.8 meters (391.29 yards) 70/30 (right) 406.23 meters (444.25 yards)
Karakul (left) 975.95 meters (1067.31 yards) Black Welsh (right) 750.96 meters (821.25 yards)
 
Finished Corriedale 2677.52 meters (2928.17 yards


Final Measurement = 5652 yards (5168 meters)
Fiber Spun = 46 ounces (2 lbs 14 oz)

it was grueling, but well worth the effort to know that I can do it.  it is easier to run a 5k than to spin one, however, I could have been "training" for the event and worked on my stamina to be sure I wasn't sore as much and it would have prepped me for the discouraging times too.

coming up  - what I thought of each fiber I spun and the yarn I produced.





Comments

Popular posts from this blog

Part Two: How it all works (according to me)

Pre Spinzilla Part Two